How we build
Built by engineers in Doha.
How the team works, and the habits it holds itself to.
Tests
Tested every night
Thousands of automated tests across the product, and the full suite runs every night.
Outcomes
Three outcomes, never two
Three outcomes, never two: pass, fail, refused. Refusing is correct behaviour, not a failure.
- pass
- fail
- refused
How the work is done
- Oracle Forms is the authority on behaviour. When in doubt, we run the same steps in a real Oracle Forms system and match it.
- The database tools are written in Rust, and the product is built test first.
What we built
Each of our tools was built on a real project. See what each one does
The team
Engineers in Doha.