COST EFFECTIVE AND FAST FORMS6i MIGRATION

If you a currently on Forms 6i client/server then the move to web based forms can seem like a huge jump to a different delivery system and technology. Methodsoft's tools and services can ease the path, with help in both the programs and the installation and configuration of the Application Server.

What are the issues about converting from Forms6i?

The methodsoft conversion will take all of these into account, and much more.

Configuration of the Application Server

The application server is a complex environment offering many different facilities. Configuring the Forms and Report Server in not a particularly easy task. Part of our migration service is to help with this configuration to create a relaible and maintainable system.

Important aspects of configuring the Application Server include:

  • Using the right security settings
  • Setting the appropriate environment variables for the Forms and Reports Servers
  • Choosing the number of Application Servers
  • Load balancing between the application servers.

KEY BENEFITS

  • A fast and complete Forms migration
  • A professional Windows and/or Web look and feel to the converted system
  • Convenience and reduced impact on your staff
  • A migration completed at a fraction of the cost of an in-house manual conversion and it can take just 2 or 3 weeks.

AUTOMATED TOOLS

Forms*Facelift
A tool to Transform and migrate Forms application to Forms 6i / 9i / 10g. Migrates Forms from versions 3.0, 4.5, 5.0 or 6i

Reports*Facelift
A service to migrate Oracle legacy reports to Reports 6i / 9i / 10g.

CAPABILITIES

Methodsoft's migration staff are skilled at using both the Forms migration tools and the Oracle Developer software so you achieve a quality result in the minimum time.

We have very reasonable consultancy rates, so it is often much more cost effective for Methodsoft to perform the complete task, than for a company to use the migration tool themselves.

The methodology we use is based on a stage, tasks and deliverables model. The migration is split into 4 stages, Planning, Preparation, Conversion and Testing. Each stage is broken down into a number of tasks. At the end of each stage there are predefined deliverables to be produced and signed off. This guarantees that the stage has been fully and correctly completed before work is commenced on the next one.